cement industry we have huge experience in machinery dismantling, installation, hot & cold alignment, including all kind of Fabrication, Erection and commissioning.
Union Cement Company (RAK)
Maintenance jobs for periodic shutdown. (2018,2019,2020 & 2021)
Assembly and Installation of 1600K CFM Pre-Heater ID Fans. (2019 & 2020)
Assembly and Installation of 2200K CFM Cooler Bag House Fans. (2020)
Assembly and Installation of 12Nos. Cooler Fans. (2020)
Dismantling, Fabrication and Installation of 240MT AQC Duct. (2019)
Fabrication and Installation of 800MT Hot air Re-circulation Duct/Structure. (2020)
Fabrication, Erection and Installation of 950TPH Raw Mill Bucket Elevator (2021)
Replacement of 2Nos. Vertical Grinding Mill Classifiers. (2021)
Speak to Our Team
Need help with the Sarsan Contracting form? Call us, and we’ll guide you through it.
At Sarsan Contracting, we believe that collaboration is the key to achieving great results. We’re proud to partner with industry leaders who share our commitment to excellence.
Get a Free Quote Now!
Unlock the Best Rates for Your Next Contracting Project with Sarsan